THE VIBE, HOLY TRINITY

As the originally part of the cancelled ‘Building Schools for the Future’ programme this scheme was delivered in a way that allowed the two form-entry primary schools to be self-funded. Planning was granted by the GLA in Dec 2013 for a 3,213m2 school including a nursery and 101 open market homes with a linear terrace at roof level. The external landscape is divided into different areas for Primary, Key Stage 1 & Key Stage 2. The external spaces include water play, an education pond, vegetable growing, climbing, sliding, a tree house and bat cave. There are also two semi-open 3rd-floor spaces for the pupils. There is an undercover climbing, balancing and swinging play area with a running track, games tables, bouldering wall and performing area. There is also a MUGA area for basketball, netball, tennis and football with an additional sprint track. Standerwick Land Design worked closely with the developer and architect to create coordinated and high-quality spaces fit for a great learning experience.

AWARDS:

AJ Architecture Awards

SchoolProject of the Year, Winner | 2017 

BuildingAwards Housing Project of the Year, Shortlisted | 2017 

Housing Design Awards, Winner 

NewLondon Awards Mixed-use, Winner

The WharfProperty Awards 

ArchitecturalAchievement, Winner

ACKNOWLEDGEMENTS: Photographs Provided by Telford Homes and Valley Provincial

STAGE:

RIBA 0-7

CLIENT:

Telford Homes

TEAM:

Telford Homes, Rock Townsend (0-4a) & Stockwool (4b-7)

PROJECT TYPE:

Residential & Education